Mainteance for Submersible Pump Operation
Mainteance | Installation |
Starting | Connecting & State | Caution & Problem

[ Installation ]
|

|
1. Installation
|
|
|
- Caution
- Measure each insulation resistance of phase
(more than 20M§Ù)
- Check a place to be installed and dimension
of the pump
- Clean the inside of pit
- Install to let the pump easy for maintenances
after installation
- Do not allow the cable joint and end to
enter the water
- Ensure the pump is correctly earthed (Green
cores) are always for the ground conductor as
standard
- Use bricks or stones to make a base when
the surface of the bottom is mud or similar
substances.
- Installation of Pipe
- Check the bottom of Pit is even (horizontal)
- Install the pipe vertically at the bottom
of sump considering Pipe Line
- After inserting Packing to the discharge
pipe, connect to Flange
- Connect the flexible joint and Valve
- Install Pressure gauge and parts of pump
- Mount the cable and chain on the hook
|
|
|

|
2. Guide
Rail System (Automatic Discharge Connector-A.D.C)
|
|
|
- Check the location of the guide pipe to install
from Manhole
|

|
|
|
|
- Install the body of A.D.C and guide pipe after
the bottom of the sump
|

|
|
|
|
- After connection of the discharge pipe ,let
it down Slowly with hoist
|

|
|
|
|
- Hang down lift chains properly under the manhole
hook , which are required to the pump
|

|
|
|

|
3. Submersible
Axial Flow & Mixed Flow Pump
|
|
|
- Installation of the Column Pipe
- Anchoring after checking of a place Anchor
will be installed
- In case having a difficulty Anchoring at
engineering works, Do set Anchoring when the column
pipe is installed
- Install the column pipe with hoist
- It should be installed vertically.
- Fix it by tightening the nut of Anchor Bolt

- Installation of the pump
- After Attaching the O-Ring at the bottom
of suction casing, let it down inside column
pipe with a proper equipment
- Fix the end of the cable and wire rope above
the column pipe not to be dropped by itself
- Control wire rope properly
- Installation of column pipe cover
- Pass cable through the hole of cover and
seal it not to e loose
- Attach O-ring above column pipe
- Tighten the nut and seal it perfectly on
the cover
- Install the air vent to the cover

|
|
|

|
4. Submersible
Mixer Installation
|
|
|
- Installation Progress
- Please install according to a below drawing

- Assemble sliding rail supporter(No.4)
& Bearing box(No.10)
- After Keep a distance ( 150mm) between the
wall and sliding rail (No.14) and fix the supporter
after installation of basic bolt
- Institute location of basic bolt installation
for pivot frame
- Fix pivot frame
- After putting bearing angle(No. 16) in pivot
frame, Institute location of basic bolt installation
of sliding rail (No.17)
- Assemble 4 bearing (No.9 material; E-PL)
in bearing box (No.10) and combine the bearing
box cover (No.8)
- Fix lifting bar with bolt & washer on
sliding rail
- Install the chain block(No.11)
- Lift mixer body(No.13) with by chain block
and dismantle sliding roller(No.5), after that,
assemble mixer body as above drawing
- Slow mixer down, fixing shackle(No.12) of
wire to chain block
- Be careful not to let the wire(No.7) submerged
- Inspection after installation
- Reconfirm bolt & nut are tightened well)
- Check whether the wire get a damage or not
)
- Inspect Sliding by moving the mixer up and
down
- Clean around tank and block entrance of
mixer not to let various obstacle to flow in
it
|
|
|