[ Cable connecting method
& How to check the state of connection ]
1. Cable connecting
method
Connecting method of two cables is based
on the Sleeve Joint (R-U, S-V, T-W)
First insulation treatment : separate
each wire and spread compound on it and wind with
electric tape and vinyl tape 2~3 times
Second insulation treatment : collect
each wire and spread compound on it and wind with
electric tape and vinyl tape 2~3 times
2. How to check
the state of connection
How to change the direction when it is anti-phase
Line Start ( 3 Line) ->
change each other
Star-Delta (6 Line) ->change
star into delta each other
Check the state of protector connection
Motor Protector The number of cable is
2 lines and symbol mark is PT, both of them
are white color. Check the insulation resistance
( It should be 0M§Ù)
Leakage Detector The number of cable
is 2 lines and symbol mark is SS, both of them
are black color. Insulation resistance ( more
than 100 M§Ù)
Bearing Temperature Sensor The number
of cable is 2 lines and symbol mark is BS, both
of them are red color. Insulation resistance
(lower than 110§Ù±10%)
- check pressure gage when it start operating
first - change the connection of terminal
board after turning off the electric power -
supply the electric power again and check
pressure gage. higher pressure is correct
revolution
Ammeter
- lower current is right revolution
JPR
Hydrometer
correct revolution : mixed and convection
phenomenon and water drops reverse revolution
: no mixed and convection phenomenon, noise
JPX
- correct revolution : the flow of water
is propeller direction - reverse revolution
:the flow of water is propeller reverse